(a)
(b)
Figure 4:
600 MHz migrated radar longitudinal section (a) and its line drawing (b) of the undamaged road section reported in Figure
3
; different road layers (P: pavement; S: subgrade; B: bedrock) and buried underground network (UN) are drawn.