Research Article

Environmental Life-Cycle Analysis of Hybrid Solar Photovoltaic/Thermal Systems for Use in Hong Kong

Table 6

Evaluation of cost payback time.

Investment: HK$Free-stand PV/T [6]BiPV/T [7]

Water storage tank400750
Collector frame and support4001800
Modular thermal absorber6002700
Solar cells and encapsulation400017500
Inverter7001000
Piping, wiring and accessories300900
Installation costs15003000

Total system costs (HK$)790027650

Useful energy savings MJ (kWh)MJ (kWh)

Thermal energy2650.4 (736.2)8127.5 (2257.6)
Electrical energy473.2 (131.4)1162.4 (322.9)
Space cooling load742.6 (206.3)

Cost savings: HK$

Gaseous fuel at HK$0.2/MJ530.11625.5
Electricity at HK$0.95/kWh124.9372.0
Annual saving655.01997.5

Cost payback time (CPBT)12.1 years13.8 years

Note: USD1 is equivalent to HK$7.8.