Economical Feasibility of Utilizing Photovoltaics for Water Pumping in Saudi Arabia

Table 6

Summary of internal rate of return (IRR) and cost of energy (COE) for all the stations considered in the present work.

LocationPretax IRR (%)Payback period (years)Cost of energy ( /kWh) Plant capacity factor (%)
EquityAssetsSimpleEquity

Dhahran10.33.211.713.119.58218.7
Riyadh10.73.511.412.919.16919.1
Jeddah10.93.511.312.819.02419.2
Guriat10.73.511.412.919.16019.1
Nejran14.05.209.711.116.31922.4

Average11.33.811.112.618.65119.7