Research Article
Experiment Investigation on Electrical and Thermal Performances of a Semitransparent Photovoltaic/Thermal System with Water Cooling
Table 2
Specification of the test components.
| Test equipment | Specification | Suppliers names | Quantity | Position |
| Ultrasonic flowmeter | TUF-2000P | Shanghai Juguan Industry Automation Device Ltd. | 1 | Main pipe line | Thermocouple | 0.2 mm copper-constantan | Homemade | 3 | Water tank | Pyranometer | TBQ-2 | Jinzhou, China (Sun Co.) | 1 | Near experimental rig with the same tilted angle | Minipump | ~1.5 KW | Homemade | 1 | Main pipe line | Ambient monitor | JZH-1 | Jinzhou, China (Sun Co.) | 1 | Near experimental rig | Others: data acquisition instrument: Agilent 34970A (USA), test computer, electrical wires, etc. |
|
|