Cost and economic assumption of the PV power plant [
1].
| Item description | Cost ($) | % of total cost |
| Feasibility study | 9012 | 0.7% | Development cost | 6437 | 0.5% | Engineering cost | 5150 | 0.4% | Solar PV equipment | 1125257 | 87.4% | Balance of power plant | 102998 | 8% | Miscellaneous | 38624 | 3% | Total initial cost | 1287479 | 100 | Annual operation and maintenance | 5000 | Annual | Depreciation | 81000 | Annual |
|
|