International Journal of Photoenergy / 2017 / Article / Tab 8 / Research Article
Evaluation of Energy Production and Energy Yield Assessment Based on Feasibility, Design, and Execution of 3 × 50 MW Grid-Connected Solar PV Pilot Project in Nooriabad Table 8 New simulation variant balance and main results.
GlobHor kWh/m Temp Amb. C GlobInc kWh/m GlobEff kWh/m Earray kWh E_Grid kWh EffArrR % EffSysR % January 126.5 17.76 173.3 164.2 2089776 20373453 12.44 12.13 February 128.1 20.98 157.5 148.9 18709171 18242204 12.26 11.95 March 170.1 25.96 189.6 178.9 21867831 21352410 11.90 11.62 April 182.0 29.41 182.7 172.0 20736061 20236994 11.71 11.43 May 198.3 32.44 182.8 171.6 20553243 19376725 11.60 10.94 June 197.4 32.58 176.3 165.4 19995150 19617989 11.70 11.42 July 168.8 31.63 153.4 143.8 17641961 17184777 11.75 11.55 August 160.6 30.30 155.0 145.7 17814786 17347500 11.85 11.54 September 169.4 29.83 180.1 169.7 20524945 19271874 11.76 11.04 October 159.5 28.67 191.5 181.2 21759705 21251333 11.72 11.45 November 130.7 23.64 176.4 167.0 20618588 20128108 12.06 11.77 December 112.1 19.20 155.6 147.3 18720953 18234173 12.41 12.09 Year 1903.4 26.89 2074.4 1955.8 239840162 232517541 11.93 11.57