Research Article
The Optimal Dispatch of Traffic and Patrol Police Service Platforms
Table 3
The optimal dispatch project of TPPSP with
= 10 min.
| Dispatching project | Path of choosing project | Time from the ith TPPSP to the jth intersection |
| 1–38 | 1-69-70-2-40-39-38 | 5.880900 | 2–16 | 2-40-39-38-16 | 7.388100 | 5–62 | 5-50-51-59-58-57-60-62 | 5.255100 | 6–48 | 6-47-48 | 2.506400 | 7–29 | 7-30-29 | 8.015500 | 8–30 | 8-33-32-7-30 | 3.060800 | 10–12 | 10-26-27-12 | 7.586600 | 11–23 | 11-22-13-23 | 4.675100 | 12–22 | 12-25-24-13-22 | 6.882500 | 13–24 | 13-24 | 2.385400 | 14–21 | 14-21 | 3.265000 | 15–28 | 15-28 | 4.751800 | 16–14 | 16-14 | 6.741700 |
|
|