Research Article

The Optimal Dispatch of Traffic and Patrol Police Service Platforms

Table 3

The optimal dispatch project of TPPSP with = 10 min.

Dispatching projectPath of choosing projectTime from the ith TPPSP to the jth intersection

1–38 1-69-70-2-40-39-38 5.880900
2–16 2-40-39-38-16 7.388100
5–62 5-50-51-59-58-57-60-62 5.255100
6–48 6-47-48 2.506400
7–29 7-30-29 8.015500
8–30 8-33-32-7-30 3.060800
10–12 10-26-27-12 7.586600
11–23 11-22-13-23 4.675100
12–22 12-25-24-13-22 6.882500
13–24 13-24 2.385400
14–21 14-21 3.265000
15–28 15-28 4.751800
16–14 16-14 6.741700