Research Article

Numerical Simulation and Optimization of Hole Spacing for Cement Grouting in Rocks

Table 2

Simulation results in each grouting stage.

Grouting stageStage 1Stage 2Stage 3Stage 4Stage 5Stage 6Stage 7Stage 8Stage 9Stage 10

Pressure/PaSimulation 2.462.833.083.383.994.675.025.135.074.23
Measurement2.512.883.133.434.044.725.075.185.075.08
Difference %−2.0−1.7−1.6−1.5−1.2−1.1−1.0−1.00.0−16.7

Grout amount/LSimulation183924663193311017481513155421101755735
Measurement2674298224932509267425152451112127322513
Difference %−31.2−17.328.024.0−34.6−39.8−36.688.2−35.8−70.8

Injection cement content/kgSimulation208228313766364320031696173424382005627
Measurement226725922015206922632042195039323201787
Difference %−8.19.286.976.1−11.5−16.9−11.1519.7−13.6−64.9