Research Article
Determination of Pavement Rehabilitation Activities through a Permutation Algorithm
Table 2
Setup of the measured field data used for the heuristic permutation algorithm.
| Section number | Road width (m) | Road length (m) | IRI (m/km) | Rutting (mm) | Fatigue cracking (%) |
| 1 | 4 | 200 | 10.55 | 7.76 | 4.69 | 2 | 23 | 380 | 10.02 | 13.27 | 8.02 | 3 | 23 | 600 | 9.29 | 6.80 | 3.43 | | | | | | | 150 | 18 | 320 | 5.92 | 4.33 | 5.64 |
|
|