Research Article

A Mathematical Model for the Industrial Hazardous Waste Location-Routing Problem

Table 1

Amount of two objective functions with regard to their weight vectors.

Solution number1234

00.10.20.3
10.90.80.7
763254763254763254849007
CPU time0.0470.0940.0390.047

Solution number5678

0.40.50.60.7
0.60.50.40.3
849007864802878519878519
CPU time0.0780.0780.0470.031

Solution number91011

0.80.91
0.20.10
895567899487977830
CPU time0.0360.0930.062