Research Article

Calculation of the Instream Ecological Flow of the Wei River Based on Hydrological Variation

Table 1

The maximum instream ecological flow at three stations.

MonthHydrological stations
Beidao (108 m3)Xianyang (108 m3)Huaxian (108 m3)

January0.36931.41572.214
February0.41641.29692.2344
March0.65081.41792.9864
April0.77631.62533.1216
May1.12522.13864.2134
June1.1242.67134.8661
July2.20393.276811.616
August2.36854.985513.4456
September2.212710.023411.3155
October1.80798.62948.5133
November0.86674.11544.3768
December0.4692.09482.7472