Research Article

Fare Design in Urban Transit Network considering Elastic Demand and Adverse Weather’s Impact

Table 7

The changes of transit route flows considering scenario 1 with different value of time.

OD pairChanges of transit route flow
Route 1Route 2Route 3Route 4Route 5Route 6Route 7Route 8

1, 2−83.77−24.7113.064.839.41−23.597.581.54
−88.152.16−5.75−5.49−0.569.944.953.85
−69.49−4.271.27−1.502.88−1.903.700.65
−40.84−13.537.182.437.28−18.20−2.37−5.10
−20.39−12.624.432.276.72−14.73−5.20−5.14

1, 3−19.40−8.83−21.15−13.03−13.70−22.68
−46.07−18.61−17.00−9.230.840.01
−34.90−9.54−12.10−6.53−4.94−8.01
−14.70−3.73−7.79−2.98−16.35−17.59
−2.13−4.73−5.25−1.44−15.62−13.53

4, 2−32.67−60.334.85−7.59−0.14
−29.98−4.29−18.91−16.86−9.69
−33.00−13.90−7.47−10.02−4.74
−33.46−25.340.13−4.500.49
−32.19−18.701.46−0.454.44

4, 3−43.31−39.25−11.700.72−11.28−4.08
−65.90−2.56−35.87−0.80−1.647.06
−56.79−14.39−33.057.812.1410.34
−23.91−35.53−16.514.84−1.755.32
−2.96−42.11−2.55−0.15−2.073.67

Note: the number of the first column, for example, , means the transit route flow with value of time 10 minus the transit route flow with value of time 5.