Research Article

The Implications of Converting a High-Volume Multilane Roundabout into a Turbo Roundabout

Table 1

Number of vehicles and heavy vehicle percentage in peak hours.

Peak hourTimePeak traffic volume (vph)Heavy vehicle (%)

AM peak hour7:15–8:1562898.19%
PM peak hour17:00–18:00573412.70%