The Implications of Converting a High-Volume Multilane Roundabout into a Turbo Roundabout

Table 11

Queue length, vehicle delay, and LOS (alternative design 3).

MovementQueue length (m)Delay (sec/veh)Level of service (LOS)
TraditionalRotorTraditionalRotorTraditionalRotor

NBR218.31237.5763.5592.29FF
NBT218.31237.5758.5193.92FF
NBL218.31237.4863.31102.28FF
WBR191.51176.7256.18134.96FF
WBT191.51512.7754.172.98FF
WBL191.51513.1255.8559.25FF
SBR258.9410.5896.7315.83FC
SBT258.9410.5897.917.38FC
SBL258.940.9496.64.82FA
EBR412470.6465.1112.39FF
EBT412549.5359.2164.74FF
EBL412549.4160.5751.14FF
Roundabout270.19325.8661.6266.66FF