Research Article
The Implications of Converting a High-Volume Multilane Roundabout into a Turbo Roundabout
Table 6
GEH statistic calculations for validation’s model.
| Movement | (m) | (c) | m−c | m+c | (m−c)2 | 2 (m−c)2 | GEH statistic |
| NB exit | 738 | 756 | −18 | 1494 | 324 | 648 | 0.66 | WB exit | 1751 | 1786 | −35 | 3537 | 1225 | 2450 | 0.83 | SB exit | 967 | 1019 | −52 | 1986 | 2704 | 5408 | 1.65 | EB Exit | 2066 | 2173 | −107 | 4239 | 11449 | 22898 | 2.32 | NB entry | 1186 | 1193 | −7 | 2379 | 49 | 98 | 0.20 | WB entry | 1834 | 1875 | −41 | 3709 | 1681 | 3362 | 0.95 | SB entry | 718 | 795 | −77 | 1513 | 5929 | 11858 | 2.80 | EB entry | 1738 | 1871 | −133 | 3609 | 17689 | 35378 | 3.13 |
|
|