Research Article

The Implications of Converting a High-Volume Multilane Roundabout into a Turbo Roundabout

Table 7

Queue length, vehicle delay, and LOS (alternative design 1).

MovementQueue length (m)Delay (second per vehicle)Level of service (LOS)
TraditionalRotorTraditionalRotorChange (±%)TraditionalRotor

NBR218.313.8363.555.08−92.1FA
NBT218.318.2258.5111.81−79.82FB
NBL218.319.8163.3115.67−75.25FC
WBR191.5147.1556.18137.16+144.14FF
WBT191.51518.6154.180.02+47.91FF
WBL191.51518.8155.8571.68+28.34FF
SBR258.940.1896.732.65−97.26FA
SBT258.942.0497.96.55−93.31FA
SBL258.943.3096.68.61−91.09FA
EBR41241.6465.1120.83+85.61FF
EBT412551.3159.2172.51+22.46FF
EBL412551.2560.5764.17+5.94FF
Roundabout270.19180.3361.6248.72−20.93FE