Research Article

The Implications of Converting a High-Volume Multilane Roundabout into a Turbo Roundabout

Table 8

Maximum throughput (alternative design 1).

Conventional roundaboutRotor roundabout
RunIntervalMovementVolumeRunIntervalMovementVolume

Average900–4500NB exit745Average900–4500NB exit542
Average900–4500WB exit1908Average900–4500WB exit1219
Average900–4500SB exit830Average900–4500SB exit667
Average900–4500EB exit2472Average900–4500EB exit1708
Average900–4500Total5955Average900–4500Total4136