Research Article

The Implications of Converting a High-Volume Multilane Roundabout into a Turbo Roundabout

Table 9

Queue length, vehicle delay, and LOS (alternative design 2).

MovementQueue length (m)Delay (sec/veh)Level of service (LOS)
TraditionalRotorTraditionalRotorTraditionalRotor

NBR218.31310.6463.55154.92FF
NBT218.31310.6458.51159.82FF
NBL218.31310.5863.31137.85FF
WBR191.510.0456.18161.08FF
WBT191.51523.3554.193.97FF
WBL191.51523.5055.8589.46FF
SBR258.948.5196.7313.68FB
SBT258.948.5197.913.86FB
SBL258.940.8796.64.66FA
EBR4120.0565.1101.47FF
EBT412548.9659.2157.21FF
EBL412548.8760.5750.04FF
Roundabout270.19277.5361.6276.30FF