Research on Loading and Unloading Resource Scheduling and Optimization of Rail–Road Transportation in Container Terminal Based on “Internet +” —for Ghana Container Port Development Planning
Table 2
Decision variables table.
Symbol
Definition
Symbol
Definition
0-1 variable, if loading operations are finished at the same place () on train with the unloading operations by the same gantry crane , then it is 1, otherwise, it is 0
0-1 variable, if loading operation and unloading operation of the same truck are finished by the same gantry crane , then it is 1, otherwise, it is 0
0-1 variable, if container operation is finished by gantry crane , then it is 1, otherwise, it is 0
0-1 variable, if gantry crane moves to the start place of operation after finishing the operation, then it is 1, otherwise, it is 0