Magnitude of Construction Cost and Schedule Overruns in Public Work Projects

Table 3

List of variables.

No.VariableType of scaleExplanation

1Type of projectNominal Either flood control, transportation, or utilities
2YearIntervalProject completion year
3Engineer estimated costRatioEngineer’s estimated cost of project
4Award costRatioContract award cost of project
5Change ordersRatioCost of change orders issued in the project
6Final cost RatioActual cost of the project
7Cost overrun (%)IntervalDifference between the actual and award cost divided by award cost
8Construction days awardedRatioDays awarded to complete the project
9Construction days addedRatioDays added to complete the project
10Schedule overrun (%)IntervalDifference between actual and award days divided by award days
11Notice to proceed (NTP) dateIntervalConstruction start date
12Substantial completion dateIntervalConstruction completion date
13Size of projectRatioSize of the project, as measured by the class of the actual cost converted to a 2008 base cost
14Project construction durationRatioDuration of the project, as measured by the class of the actual completion duration
15Project completion yearIntervalProject completion year, as measured by the class of the actual project completion date