Magnitude of Construction Cost and Schedule Overruns in Public Work Projects
Table 6
Test of homogeneity.
| Metrics | Levene’s statistic | Significance |
| Factor: project types | | | Construction cost overrun | 3.117 | 0.045 | Construction schedule overrun | 0.175 | 0.840 | Factor: project size | | | Construction cost overrun | 1.819 | 0.164 | Construction schedule overrun | 12.203 |
<0.001** | Factor: project construction duration | | Construction cost overrun | 2.871 | 0.091 | Construction schedule overrun | 11.174 | 0.001** | Factor: project completion year | | | Construction cost overrun | 0.781 | 0.377 | Construction schedule overrun | 10.756 | 0.001** |
|
|
Statistically significant at alpha level 0.05. Statistically significant at alpha level 0.01.
|