Research Article
Estimating Concrete Workability Based on Slump Test with Least Squares Support Vector Regression
Table 2
The dataset of concrete slump test.
| Mix | | | | | | | |
| 1 | 261.0 | 397.0 | 397.0 | 1200.0 | 176.0 | 1.3 | 8.0 | 2 | 248.0 | 399.0 | 399.0 | 1208.0 | 176.0 | 1.2 | 8.0 | 3 | 320.0 | 388.0 | 388.0 | 1154.0 | 179.0 | 3.2 | 9.0 | 4 | 304.0 | 391.0 | 391.0 | 1162.0 | 179.0 | 3.0 | 9.0 | 5 | 336.0 | 385.0 | 385.0 | 1148.0 | 178.0 | 3.4 | 9.5 | 6 | 356.0 | 769.0 | 0.0 | 1154.0 | 170.0 | 3.2 | 10.0 | | | | | | | | | 90 | 339.0 | 765.0 | 0.0 | 1154.0 | 177.0 | 3.4 | 8.5 | 91 | 375.0 | 770.0 | 0.0 | 1144.0 | 167.0 | 3.4 | 10.0 | 92 | 393.0 | 757.0 | 0.0 | 1144.0 | 166.0 | 3.5 | 11.0 | 93 | 404.0 | 767.0 | 0.0 | 1124.0 | 166.0 | 4.0 | 9.0 | 94 | 378.0 | 751.0 | 0.0 | 1108.0 | 186.0 | 3.8 | 18.0 | 95 | 359.1 | 765.0 | 0.0 | 1111.0 | 186.0 | 3.6 | 19.0 |
|
|