(1) OLT (ports and chassis); (2) splitter (primary split and secondary split); (3) ONU and CPE; (4) optical repeater.
Housing costs
Cost of building remote nodes—splitter cabinet/closures (secondary split). The cost for building the CO is not included.
Civil works (Labor )
Cost of the labor required and include (1) trenching costs (digging and ducting costs) of feeder and distribution plant; (2) cable installation—pulling (cable not included) the cable on the feeder and distribution plant.
Cable costs
Cost of the necessary fiber optics (installation not included). Include the fiber cable required for the feeder and distribution plant.