Research Article

Implementation of Control System for Hydrokinetic Energy Converter

Figure 1

Aerial view of Söderfors. The turbine and generator will be installed on the downstream side of the bridge (a), the control station will be situated about 150 m from the turbine (b). A hydropower station is situated upstream from the site (c).
342949.fig.001