Research Article

Application of Unit Commitment with Market Pool in a Peaking Power Generation Firm in the Philippines for a Cost Reduction Case Study

Table 1

Sample of 24-hour dispatch schedule.

IntervalGenerator (load)
1 (MW)2 (MW)3 (MW)4 (MW)WESM (MW)Demand (MW)Total cost (Php) Actual cost (Php) Difference (Php)

1–3
4–6
7–918.1418.1424,088.4753,007.7028,919.23
10–12363664,754.16145,114.3780,360.21
13–1577.7477.74186,172.00306,765.78120,593.78
16–18119.28624.1650.44124,795.60173,906.6149,111.01
19–217.611.524.143.2102,735.40155,361.2052,625.80
22–24101013,553.6027,155.7013,602.10