Research Article
A Novel Hybrid Method for Short-Term Power Load Forecasting
Table 4
The error of power load forecasting using different methods based on hourly observation.
| ā | Hybrid method | LSSVM | BPNN | WEEMD-LSSVM | GA-LSSVM | EEMD-LSSVM |
| MAE (MW) | 244.469 | 1313.7 | 1812.2 | 622.200 | 1083.4 | 909.020 | MAPE (%) | 1.56 | 8.44 | 11.81 | 4.05 | 7.12 | 6.08 | RMSE (MW) | 407.308 | 1552.5 | 2089.4 | 720.567 | 1220.7 | 1031.3 |
|
|