Research Article

A Novel Hybrid Method for Short-Term Power Load Forecasting

Table 4

The error of power load forecasting using different methods based on hourly observation.

ā€‰Hybrid methodLSSVMBPNNWEEMD-LSSVMGA-LSSVMEEMD-LSSVM

MAE (MW)244.4691313.71812.2622.2001083.4909.020
MAPE (%)1.568.4411.814.057.126.08
RMSE (MW)407.3081552.52089.4720.5671220.71031.3