Review Article
The Current Situation of Wind Energy in Turkey
Table 3
Wind power plants under operation in Turkey (July 2012).
| Name of windfarm | Installed capacity (MW) | Turbine power | Turbine brand | Location | Production date |
| Çeşme | 1.50 | 0.5 MW | Enercon | İzmir-Çeşme | 1998 | Ares | 7.20 | 0.6 MW | Vestas | İzmir-Çeşme | 1998 | Bozcaada | 10.20 | 0.6 MW | Enercon | Çanakkale-Bozcaada | 2000 | Intepe | 30.40 | 0.8 MW | Enercon | Çanakkale-İntepe | 2007 | Karakurt | 10.80 | 1.8 MW | Vestas | Manisa-Akhisar | 2007 | Burgaz | 14.90 | 0.8 MW + 0.9 MW | Enercon | Çanakkale-Gelibolu | 2007 | Sayalar | 34.20 | 0.9 MW | Enercon | Manisa-Sayalar | 2008 | Çatalca | 60.00 | 3 MW | Vestas | İstanbul-Çatalca | 2008 | Yuntdağ | 57.50 | 2.5 MW | Nordex | İzmir-Aliağa | 2008 | Kemerburgaz | 24.00 | 2 MW | Enercon | İstanbul-Gaziosmanpaşa | 2008 | Mare manastır | 39.20 | 0.9 MW + 0.8 MW | Enercon | İzmir-Çeşme | 2006/2007 | Sunjut | 1.20 | 0.6 MW | Enercon | İstanbul-Hadımköy | 2003 | Teperes | 0.85 | 0.85 MW | Vestas | İstanbul-Silivri | 2006 | Bandırma | 35.00 | 1.5 MW | GE + Nordex | Balıkesir-Bandırma | 2006 | Şamlı | 114.00 | 3 MW | Vestas | Balıkesir-Şamlı | 2008 | Datça | 29.60 | 0.8 MW + 0.9 MW | Enercon | Muğla-Datça | 2008 | Sebenoba | 30.00 | 2 MW | Vestas | Hatay-Samandağ | 2008 | Akbuk | 31.50 | 2.1 MW | Suzlon | Aydın-Didim | 2009 | Çamseki | 20.80 | 2 MW + 0.8 MW | Enercon | Çanakkale-Ezine | 2009 | Keltepe | 20.70 | 0.9 MW | Enercon | Balıkesir-Susurluk | 2009 | Gökçedağ | 135.00 | 2.5 MW | GE | Osmaniye-Bahçe | 2009/2010 | Düzova | 30.00 | 2.5 MW | GE | İzmir-Bergama | 2009/2010 | Mazı-3 | 30.00 | 2.5 MW | Nordex | İzmir-Çeşme | 2009/2010 | Ayyıldız | 15.00 | 3 MW | Vestas | Balıkesir-Bandırma | 2009 | Bandırma | 60.00 | 3 MW | Vestas | Balıkesir-Bandırma | 2009/2010 | Soma | 140.10 | 2 MW + 0.9 MW | Enercon | Manisa-Soma | 2011/2012 | Belen | 36.00 | 3 MW | Vestas | Hatay-Belen | 2009/2010 | Sarıkaya | 28.80 | 2 MW + 0.8 MW | Enercon | Tekirdağ-Şarköy | 2009 | Kocadağ-2 | 17.50 | 2.5 MW | Nordex | İzmir-Urla | 2010 | Bandırma-3 | 25.00 | 2.5 MW | Nordex | Balıkesir-Bandırma | 2010 | Mersin | 33.00 | 3 MW | Vestas | Mersin-Mut | 2010 | Boreas-1 | 15.00 | 2.5 MW | Nordex | Edirne-Enez | 2010 | Aliağa | 90.00 | 2.5 MW | Nordex | İzmir-Aliağa | 2010 | Şenbuk | 15.00 | 3 MW | Vestas | Hatay-Belen | 2010 | Ziyaret | 57.50 | 2.5 MW | GE | Hatay-Samandağ | 2010/2011 | Soma | 90.00 | 2.5 MW | Nordex | Manisa-Soma | 2010 | Kuyucak | 25.60 | 2 MW + 0.8 MW | Enercon | Manisa-Kırkağaç | 2010 | Sares | 22.50 | 2.5 MW | GE | Çanakkale-Ezine | 2010/2011 | Turguttepe | 24.00 | 2 MW | Vestas | Aydın-Çine | 2010 | Çataltepe res | 16.00 | 2 MW | Enercon | Balıkesir | 2010 | Çanakkale | 29.90 | 2.3 MW | Siemens | Çanakkale-Ezine | 2011 | Susurluk | 45.00 | 2.5 MW | Nordex | Balıkesir-Susurluk | 2011 | Seyitali res | 30.00 | 2 MW | Enercon | İzmir | 2011 | Söke-Çatalbük | 30.00 | 2 MW | Gamesa | Aydın | 2012 | Aksu | 72.00 | 2 MW | Vestas | Kayseri | 2012 | Amasya | 40.00 | 2.5 MW | Nordex | Amasya | 2012 | Metristepe | 40.00 | 2.5 MW | Nordex | Bilecik | 2012 | Dağpazarı | 39.00 | 3 MW | Siemems | Mersin | 2012 | Şenköy | 27.00 | 3 MW | Alstom W. | Hatay | 2012 | Şahres | 93.00 | 3 MW | Vestas | Balıkesir | 2011 | Ayres | 5.00 | 1.8 MW | Vestas | Çanakkale | 2011 | Akres | 45.00 | 2.5 MW | Nordex | Manisa | 2011 | Karadağ | 10.00 | 2.5 MW | GE | İzmir | 2012 | Bozyaka | 12.50 | 2.5 MW | Nordex | İzmir | 2011 | Killik | 40.00 | 2.5 MW | Nordex | Tokat | 2012 | Saray | 4.00 | 2 MW | Enercon | İstanbul | 2012 |
| Total | 2041.35 | | | | |
|
|