Research Article

Extraction of Transmission Parameters for Siting and Sizing of Distributed Energy Sources in Distribution Network

Table 1

Comparative analysis of three methods of loss calculations for 16-bus system.

Bus numbersCalculated loss at different DG locationBus numbersCalculated real loss at different DG location
Location of DGMTP
(Kw + Kvar)
ELF
(Kw)
IA
(Kw)
Priority list of buses MTP
(Kw)
ELF
(Kw)
IA
(Kw)

W/O DG 515.4 + 607.7 511.43511.43Bus 9163.4164.01166.31
Bus 4 350.1 + 418.2 450.33450.7Bus 12249196.84200.93
Bus 5 298.4 + 336.5 456.57456.86Bus 11264.6270.99283.55
Bus 6 359.5 + 427.9 450.21450.44Bus 8290.4228.57233.17
Bus 7356.5 + 423.2 455.05455.32Bus 5298.4456.57456.86
Bus 8 290.4 + 380.6 228.57233.17Bus 10341.3335.61350.77
Bus 9 163.4 + 212.7 164.01166.31Bus 4350.1450.33450.7
Bus 10 341.3 + 418.9 335.61350.77Bus 14351.1491.93493.16
Bus 11 264.6 + 296.7 270.99283.55Bus 7356.5455.05455.32
Bus 12 249.0 + 304.3 196.84200.93Bus 6 359.5450.21450.44
Bus 13 368.5 + 452.4 483.53483.7Bus 13368.5483.53483.7
Bus 14 351.1 + 429.0 491.93493.16Bus 15378.1477.74477.86
Bus 15 378.1 + 445.1 477.74477.86Bus 16379.8478.01478.13
Bus 16379.8 + 458.6 478.01478.13W/O DG515.4511.43511.43