Research Article
Nanoscale Zero-Valent Iron for Sulfide Removal from Digested Piggery Wastewater
Table 1
Wastewater quality monitored during the period of the pilot test.
| | Day 0 | Day 1 | Day 7 | Day 14 | Day 30 | | Cont. | Exp. | Cont. | Exp. | Cont. | Exp. | Cont. | Exp. | Cont. | Exp. |
| (°C) | 29.69 | 29.61 | 33.9 | 35.2 | 31.27 | 32.88 | 28.5 | 29.47 | 32.8 | 31.2 | DO (mg/L) | 1.0 | 1.04 | 0.73 | 0.63 | 0.76 | 0.56 | 0.45 | 0.48 | 0.23 | 0.41 | pH | 7.19 | 7.04 | 7.15 | 7.32 | 7.2 | 7.35 | 7.05 | 7.17 | 7.2 | 7.35 | ORP (mV) | −384 | −372 | −388 | −376 | −312 | −322 | −325 | −270 | −398 | −350 | Fe(II) | 4.3 | 4.1 | 5.0 | 19.3 | 3.25 | 2.0 | 4.1 | 3.25 | 3.0 | 3.0 |
|
|
Cont. means the control test; Exp. means the experimental test.
|