Research Article

A Heuristic Approach for Optimal Planning and Operation of Distribution Systems

Table 3

Best results values of IEEE 13-bus test system in simulation I condition.

Load profile conditionVoltage magnitude in puAlgorithmNo controlCase 1 valuesCase 2 valuesCase 3 values

Simulation I (minimum load)MinimumNo control0.90810.90810.90810.9081
ICA0.90810.985440.984620.98684
PSO0.90810.985440.984770.97644
MFO0.90810.985440.98460.9838
MaximumNo control0.999950.999950.999950.99995
ICA0.999951.03471.02091.0234
PSO0.999951.03471.0221.0275
MFO0.999951.03471.02691.0227