Research Article

Effectively Monitoring the Performance of Integrated Process Control Systems under Nonstationary Disturbances

Table 3

ANOVA for MSE.

SourceSum of SquaresDfMean Square Value -value

A-θ0.606310.606343.3662
B-Shift3.036013.0360217.1522
C-Controller7.283117.2831520.9385
D-Chart0.049910.04993.5695
E-Signal0.102210.10227.3074
AB1.298211.298292.8550
AC2.040512.0405145.9471
BC1.582011.5820113.1569
BD0.000910.00090.0673
BE0.015110.01511.0800
CD1.39 -0511.39 -050.0010
CE0.002710.00270.1947
DE0.111910.11198.0072.0152
ABC1.022111.022173.1096
BCD0.036310.03632.5999
BCE0.048110.04813.4374
BDE0.021710.02171.5521
CDE0.039010.03902.7864
BCDE0.142110.142110.1667
Residual0.1678120.0140

Total17.605931