Research Article

Risk-Based Allowed Outage Time and Surveillance Test Interval Extensions for Angra 1

Table 5

Modification of pump probabilities to simulate staggered testing strategy.

SystemModification of common-cause failure to start probability to reflect staggered testing

SIS—Pumps A and B
SWS—Pumps A and B, or B and C, or A and C
SWS—Pumps A and B and C
AFWS—A and B motor-operated pumps