Research Article
Risk-Based Allowed Outage Time and Surveillance Test Interval Extensions for Angra 1
Table 5
Modification of pump probabilities to simulate staggered testing strategy.
| System | Modification of common-cause failure to start probability to reflect staggered testing |
| SIS—Pumps A and B | | SWS—Pumps A and B, or B and C, or A and C | | SWS—Pumps A and B and C | | AFWS—A and B motor-operated pumps | |
|
|