Research Article
Design for Reliability of Complex System: Case Study of Horizontal Drilling Equipment with Limited Failure Data
Table 5
Initial reliability and target reliability for subsystems of drilling equipment with Weibull distribution.
| Subsystem | Reliability importance (2000 hours) | Initial reliability (2000 hours) | Weighting factors | Target reliability (2000 hours) |
| Frame | | | | | Cab | | | | | Engine | | | | | Hydraulic | | | | | Rod loader | | | | | Vise | | | | | Control and electrical | | | | | Water pump | | | | | The whole system | — | | — | |
|
|