Case Study of Integrating an Offshore Wind Farm with Offshore Oil and Gas Platforms and with an Onshore Electrical Grid
Table 3
Nine dynamic simulation cases.
| Contingency scenarios | Operation modes |
| A: Online start of one large induction motor | A1: 1 gas turbine | A2: 1 gas turbine + 2 wind turbine: 10 MW |
| B: Loss of one gas turbine production | B1: 2 gas turbine + 2 wind turbine: 10 MW | B2: 2 gas turbine + 4 wind turbine: 20 MW |
| C: Loss of all wind turbines | C1: 1 gas turbine + 2 wind turbine: 10 MW | C2: 2 gas turbine + 4 wind turbine: 10 MW | C3: 2 gas turbine + 4 wind turbine: 10 MW |
| D: Wind fluctuations | A2: 1 gas turbine + 4 wind turbine: 10 MW | A2: 2 gas turbine + 4 wind turbine: 10 MW |
|
|