Case Study of Integrating an Offshore Wind Farm with Offshore Oil and Gas Platforms and with an Onshore Electrical Grid

Table 3

Nine dynamic simulation cases.

Contingency scenariosOperation modes

A: Online start of one large induction motorA1: 1 gas turbine
A2: 1 gas turbine + 2 wind turbine: 10 MW

B: Loss of one gas turbine productionB1: 2 gas turbine + 2 wind turbine: 10 MW
B2: 2 gas turbine + 4 wind turbine: 20 MW

C: Loss of all wind turbinesC1: 1 gas turbine + 2 wind turbine: 10 MW
C2: 2 gas turbine + 4 wind turbine: 10 MW
C3: 2 gas turbine + 4 wind turbine: 10 MW

D: Wind fluctuationsA2: 1 gas turbine + 4 wind turbine: 10 MW
A2: 2 gas turbine + 4 wind turbine: 10 MW