Techno-Economic Feasibility of Small Scale Hydropower in Ethiopia: The Case of the Kulfo River, in Southern Ethiopia

Table 8

Annualized costs.

ComponentCapitalReplacementO&MFuelSalvageTotal

Hydro261,5670313,88000575,447
Grid10,4630−1,031,91400−1,021,451
Other16701,000001,167
System272,1960−717,03400−444,838