Research Article
Control-Scheduling Codesign Exploiting Trade-Off between Task Periods and Deadlines
Figure 3
The four cases to be considered by our heuristic algorithm. S and N mean schedulable and not schedulable, respectively. H and L mean higher slope and lower slope, respectively.
(a) Both directions are schedulable |
(b) Both directions are not schedulable |
(c) Lower slope is schedulable, but higher slope is not schedulable |
(d) Lower slope is not schedulable, but higher slope is schedulable |