| Number | Description of tasks | Resource |
Duration (day) |
Predecessor | | | | |
| 1 | Operating structure design | 3 | 0 | 0 | 0 | 6 | 13, 15 | 2 | Vessel design | 5 | 3 | 3 | 2 | 12 | 7, 9 | 3 | Plant layout/general arrangement | 4 | 2 | 4 | 2 | 5 | | 4 | Shipping design | 4 | 2 | 2 | 2 | 8 | 1, 15 | 5 | Structure lifting design | 5 | 0 | 0 | 0 | 4 | 1, 7, 9, 12 | 6 | Pressure drop analysis | 4 | 2 | 2 | 2 | 4 | 8, 15, 17 | 7 | Process engineering | 4 | 3 | 3 | 2 | 3 | | 8 | Structural documentation | 0 | 4 | 2 | 0 | 3 | 3, 4, 5 | 9 | Size valves | 2 | 1 | 5 | 3 | 4 | 3, 12 | 10 | Wind load design | 4 | 0 | 0 | 0 | 5 | 1, 2, 8 | 11 | Seismic design | 5 | 0 | 0 | 0 | 9 | 3, 5, 7, 12 | 12 | Piping design | 3 | 0 | 0 | 1 | 4 | | 13 | Process and instrumentation diagram | 3 | 2 | 0 | 1 | 2 | 2, 7, 12 | 14 | Equipment support | 3 | 0 | 3 | 2 | 2 | 1, 2, 6, 7, 15 | 15 | Pipe flexibility analysis | 4 | 2 | 2 | 2 | 2 | 2, 3, 12 | 16 | Design documentation | 5 | 2 | 2 | 0 | 4 | 1, 2, 3, 5, 10, 18 | 17 | Foundation load design | 5 | 2 | 4 | 2 | 5 | 4, 9, 13 | 18 | Insulation structural design | 2 | 2 | 3 | 3 | 5 | 1, 2, 7, 8, 11 | 19 | Structural bill of material (BOM) | 3 | 2 | 3 | 4 | 6 | 5, 10, 18 | 20 | Assembly design | 4 | 0 | 0 | 0 | 7 | 4, 9, 12, 14 |
|
|