Research Article

Applying an Extended Fuzzy Parametric Approach to the Problem of Water Allocations

Table 1

Parameters of water demand, reservoir capacity, and water loss rate.

Time period
t = 1t = 2t = 3

Water demand (×106 m3)

Municipality9.71011
Agriculture1313.514.5
Industry11.51212.5

Capacity (×106 m3)

Reservoir 1(5, 5.5, 6, 6.5)(5.5, 6, 6.5, 7)(4, 4.5, 5, 6)
Reservoir 2(3.5, 4.5, 5, 5.5)(4, 4.5, 5.5, 6)(3, 3.5, 4, 5)

Loss rateMunicipalityAgricultureIndustry

Reservoir 1(0.1, 0.15, 0.18, 0.2)(0.2, 0.23, 0.25, 0.3)(0.25, 0.3, 0.35, 0.4)
Reservoir 2(0.05, 0.08, 0.1, 0.15)(0.1, 0.15, 0.2, 0.25)(0.15, 0.2, 0.25, 0.3)