Research Article
Path Planning for Spray Painting Robot of Workpiece Surfaces
Table 1
The results of non-optimal and optimal tool path planning.
| ā | Optimal | Non-optimal |
| Average (m) | 49.3 | 48.8 | Maximum (m) | 55.6 | 58.8 | Minimum (m) | 45.8 | 41.5 | Process time (S) | 49.6 | 57.8 |
|
|