Research Article

Path Planning for Spray Painting Robot of Workpiece Surfaces

Table 1

The results of non-optimal and optimal tool path planning.

ā€‰OptimalNon-optimal

Average ( m)49.3 48.8
Maximum ( m)55.658.8
Minimum ( m)45.841.5
Process time (S)49.657.8