Journals
Publish with us
Publishing partnerships
About us
Blog
Mathematical Problems in Engineering
Journal overview
For authors
For reviewers
For editors
Table of Contents
Special Issues
Mathematical Problems in Engineering
/
2013
/
Article
/
Tab 5
/
Research Article
Multi Objective Optimization of Coordinated Scheduling of Cranes and Vehicles at Container Terminals
Table 5
The best scheduling string, based on the proposed GA method in medium size test case.
Scheduling string
Task no.
Vehicle no.
Task no.
Vehicle no.