Research Article

A Fuzzy ANP Model Integrated with Benefits, Opportunities, Costs, and Risks to Prioritize Intelligent Power Grid Systems

Table 3

Comparison matrix for the control criteria.

CC1CC2CC3CC4Priorities of control criteria

CC110.7723.1955.5250.371
CC21.29514.7174.2190.425
CC30.3130.21214.0650.140
CC40.1810.2370.24610.063

λ max = 4.202; CI = 0.068;  CR  =  0.073.