Computational Experiment Study on Selection Mechanism of Project Delivery Method Based on Complex Factors
Table 1
Initializations of experiment parameters.
| Parameters | Standing for | Scale |
| | The weight of project complexity | 0.5 | | The weight of project governance strength | 0.5 | | Growth times of contractor | 50 | | Growth rate of contractor | Random float number between 0 and 0.1 | | The design ability value of designer | Random float number between 0.5 and 1 | | The construction ability value of designer | Random float number between 0 and 0.1 | | The design ability value of constructor | Random float number between 0 and 0.1 | | The construction ability value of contractor | Random float number between 0.5 and 1 | | The weight of design | 0.15, 0.075, 0.075, 0.075, 0.15 | | The weight of construction | 0.175, 0.105, 0.105, 0.105, 0.055 |
|
|