Research Article

Computational Experiment Study on Selection Mechanism of Project Delivery Method Based on Complex Factors

Table 1

Initializations of experiment parameters.

ParametersStanding forScale

The weight of project complexity0.5
The weight of project governance strength0.5
Growth times of contractor50
Growth rate of contractorRandom float number between 0 and 0.1
The design ability value of designerRandom float number between 0.5 and 1
The construction ability value of designerRandom float number between 0 and 0.1
The design ability value of constructorRandom float number between 0 and 0.1
The construction ability value of contractorRandom float number between 0.5 and 1
The weight of design0.15, 0.075, 0.075, 0.075, 0.15
The weight of construction0.175, 0.105, 0.105, 0.105, 0.055