Journals
Publish with us
Publishing partnerships
About us
Blog
Mathematical Problems in Engineering
Journal overview
For authors
For reviewers
For editors
Table of Contents
Special Issues
Mathematical Problems in Engineering
/
2014
/
Article
/
Tab 9
/
Research Article
Building Cost Function 3D Benchmarks to Improve the Economic Statistical Design of
Control Charts
Table 9
Accuracies of the 3D Vis method in comparison with HJ and GA: Weibull failure distribution with
.
Method
0.05
91
2.0000
1.5368
0.1243
0.1982
229.99
0.25
0.25
87
1.1926
1.4809
0.1386
0.1973
400.34
0.50
88
3.4406
1.4962
0.1346
0.1979
516.35
0.05
28
1.3000
1.7938
0.0729
0.1971
270.59
HJ
0.50
0.25
28
0.7561
1.7929
0.0730
0.1969
444.33
0.50
26
0.6257
1.7007
0.0890
0.1980
541.21
0.05
11
1.3000
2.2544
0.0242
0.1441
263.23
1.00
0.25
13
1.0000
2.0805
0.0375
0.0636
288.67
0.50
12
0.8071
2.0394
0.0414
0.0771
288.84
0.05
90
2.0769
1.5194
0.1287
0.1970
229.31
0.25
0.25
99
1.2073
1.6432
0.1003
0.1992
416.15
0.50
93
3.8578
1.5666
0.1172
0.1992
514.82
0.05
24
1.4386
1.5782
0.1145
0.1918
270.00
GA
0.50
0.25
23
0.8823
1.5463
0.1220
0.1972
441.89
0.50
24
0.6575
1.4507
0.1469
0.1589
546.09
0.05
8
1.2560
1.9792
0.0478
0.1979
266.44
1.00
0.25
8
0.8372
1.9746
0.0483
0.1966
294.58
0.50
11
0.7471
1.9763
0.0481
0.1971
296.11
0.05
84
1.9900
1.4495
0.1472
0.1999
224.99
0.25
0.25
84
1.2500
1.4495
0.1472
0.1999
396.69
0.50
84
5.0000
1.4395
0.1500
0.1971
502.14
0.05
24
1.3400
1.5995
0.1097
0.1976
268.72
3D Vis
0.50
0.25
22
0.7750
1.4995
0.1337
0.1988
438.42
0.50
21
0.6200
1.4495
0.1472
0.1999
536.13
0.05
11
1.3400
2.2000
0.0278
0.1321
263.11
1.00
0.25
12
0.9667
2.0730
0.0382
0.0821
288.62
0.50
13
0.8333
2.0467
0.0407
0.0595
288.75