Research Article

Condition-Based Maintenance Strategy for Production Systems Generating Environmental Damage

Table 6

The obtained nearly optimal solution for the nonperiodic inspection policy.


(Ton)

(week)

(%)
CM cost
($)

(%)
PM cost
($)
Inspection cost
($)
Environmental
penalty cost ($)
(week)
($/week)

26.6,  7.1,  7.46.2756.4193.73468.671.091090.0039396.7100.46