Research Article

Engineering Mathematical Analysis Method for Productivity Rate in Linear Arrangement Serial Structure Automated Flow Assembly Line

Table 1

Overall detail data list required for engineering mathematical analysis method.

Data categoryCollection methodData parameterSymbolUnit

Actual productivityRetrospective studyNumber of parts producedParts
Time usedmin or sec

Technical dataObservational studyTotal machining timemin or sec
Auxiliary timemin or sec
Number of stationsā€”
Correction factor of bottleneck machining timeā€”

Reliability dataRetrospective studyStations failure rate1/min or 1/sec
Control system failure rate1/min or 1/sec
Transport system failure rate1/min or 1/sec
Defect parts failure rate1/min or 1/sec
Mean time to repairmin or sec