Research Article
Engineering Mathematical Analysis Method for Productivity Rate in Linear Arrangement Serial Structure Automated Flow Assembly Line
Table 1
Overall detail data list required for engineering mathematical analysis method.
| Data category | Collection method | Data parameter | Symbol | Unit |
| Actual productivity | Retrospective study | Number of parts produced | | Parts | Time used | | min or sec |
| Technical data | Observational study | Total machining time | | min or sec | Auxiliary time | | min or sec | Number of stations | | ā | Correction factor of bottleneck machining time | | ā |
| Reliability data | Retrospective study | Stations failure rate | | 1/min or 1/sec | Control system failure rate | | 1/min or 1/sec | Transport system failure rate | | 1/min or 1/sec | Defect parts failure rate | | 1/min or 1/sec | Mean time to repair | | min or sec |
|
|