Research Article

Modeling the Coordinated Operation between Bus Rapid Transit and Bus

Table 1

Optimization results of different operation modes.

HeadwaySlack time

Headway
(min)
hB8.072.193.83 (skip-stop)
3.86 (all-stop)
2.17 (min)3.812.673.96
h122.5011.696.4111.853.812.673.96
h220.4412.8011.0312.783.812.673.96
h313.7710.406.675.543.812.673.96
h412.3110.2522.9810.733.812.673.96
h516.117.788.3310.153.812.673.96
h614.506.668.6212.353.812.673.96
h720.429.109.948.023.812.673.96
h823.8910.8111.7711.863.812.673.96