Research Article

Opposition-Based Improved PSO for Optimal Reactive Power Dispatch and Voltage Control

Table 2

All expenses of reactive power optimization.

Unit network loss convert expensed (10000 RMB/MW)Voltage dissatisfaction penalty (10000 RMB)Unit operation cost of transformer tap (10000 RMB)

6930.5