Research Article

Nonlinear Stability Analysis of a Composite Girder Cable-Stayed Bridge with Three Pylons during Construction

Figure 7

Construction scheme applied on the structure in the side of midpylon.
(a) Double cantilever construction scheme
(b) The set of location of temporary pier