Journals
Publish with us
Publishing partnerships
About us
Blog
Mathematical Problems in Engineering
Journal overview
For authors
For reviewers
For editors
Table of Contents
Special Issues
Mathematical Problems in Engineering
/
2016
/
Article
/
Tab 12
/
Research Article
Applying Hybrid Decision-Making Method Based on Fuzzy AHP-WOWA Operator for Emergency Alternative Evaluation of Unattended Train Operation Metro System
Table 12
Aggregation matrix under criterion of the performance of emergency recovery (C3).
Emergency alternatives
C3: the performance of emergency recovery
S1
S2
S3
S4
S5
S1
0.5000
0.9000
0.9000
0.9000
0.4372
S2
0.5800
0.5000
0.9000
0.7000
0.6600
S3
0.4600
0.1000
0.5000
0.3000
0.5800
S4
0.4600
0.1832
0.7000
0.5000
0.6600
S5
0.3000
0.6220
0.7960
0.6220
0.5000