Research Article

Experimental and Numerical Simulations Predictions Comparison of Power and Efficiency in Hydraulic Turbine

Table 1

Summary of measurements.

Test numberOpening of the wicked gate [%]Mechanical power [MW]Flow rate [m3/s]Leakage flow [m3/s]Total flow [m3/s]Net head [m]Efficiency [%]

198.831.6588.970.789.6742.4085.10
286.730.7181.300.782.0042.6489.80
378.429.0375.440.776.1442.7591.16
469.526.0568.030.768.7343.0989.91
561.422.6360.290.760.9943.1887.84
652.919.0252.200.752.9043.2784.92
745.515.7245.410.746.1143.5280.08
836.710.1434.980.735.6844.1065.89